National Directorate of Equipment and Office dose management

Transmission Network (DRT) is managed to ensure the operation of the 150KV Sub-station system and transmission network. The implementation of the activities was carried out by the National Dispatching Center (NDC) and the Sub-station Maintenance Unit and the inspection, monitoring and transmission line maintenance section. The Department of the transmission network (DRT) has an important role in ensuring a 150kV transmission line for the transport of electrical energy from Hera and Betano to the national territory. To ensure the quality of the power supply in the transmission system in Operations and Maintenance (O & M), EDTL, E.P. established an extra contract with the International Company CNI22. EDTL, E.P. started with its structure reform phase and prepared technical staff to work with the company to prepare conditions for future work. It is expected that the technical staff will be transferred to EDTL E.P to reduce dependence in the future.