IGEADI.IP – THE COMPANY AND THE AUTHORITY OF THE COMPANY CONTINUE TO DISCUSS THE CAUSE OF THE PROJECT OPEN A NEW ROAD IN ATAURO.

DILI IGEADI.IP – The continuation of the new road opening project in Atauro Municipality was held at the IGEADI Central Field.IP Colmera Dili, on Friday (10 / 05 / 2024), led by the President of the Institute for Equipment Management and Infrastructure Development Support. Public Institute. (IGEADI.IP), Dr. Ana Paula da Cruz, accompanied by Vogal, Ms. Adelina Andrade de Jesus and Legal Advisor IGEADI.IP Dr. Benevides Correia Barros.

Through his speech the President of IGEADI.IP, Dr. Ana Paula da Cruz, said that this discussion will discuss technical preparation and how to prepare for the launch of new roads in two villages such as the Sucos of Makadade and Beloi, Atauro Municipality.

In the same place as Vogal IGEADI.IP Ms. It is prepared and just waiting for implementation but IGEADI.IP also needs to report at the meeting that, if some issues are not yet complete, there is a discussion to be improved and completed immediately before the celebration of the Memorandum of Understanding (MoU).

While the Vice-General of the Ministry of Finance, Adam Soares, stated that the participation of the Ministry of Finance to hear what IGEADI was.IP has prepared for the celebration of the MoU, if something is not yet right, this discussion can be done in more detail and improved.

Meanwhile, the preparation of the celebration of the MoU between IGEADI.IP – FECA and the Atauro Authority, for the new road opening project in Makadade Village, Beloi Village, Atauro Municipality, was attended by the President of IGEADI.IP, Ana Paula da Cruz, Vogal IGEADI.IP, Adelina Andrade de Jesus, Legal Advisor IGEADI.IP, Benevides Correia Barros. The Deputy Vice Minister, Adam Soares, the State and Technical Advisors of IGEADI-IP, FICA and the Municipal Authority of Atauro.

#media_Igeadi_IP

Leave Comment

Your email address will not be published. Required fields are marked *